IntegrateITAutomation & Security

★Commercial · Service

Commercial Lighting Control · Kansas City.

IntegrateIT programs commercial lighting control for business build-outs in Kansas City, Missouri and Overland Park, Kansas. We are an Overland Park, Kansas integrator founded in 2021 by Daniel and Moran Alon: Lutron Certified Dealer, Control4 Platinum Dealer with a Control4 Certified Showroom, Crestron Elite Partner, CEDIA member, HTA Certified, BBB-accredited. We design, install, program and commission Lutron Vive and Athena commercial lighting control across the whole metro on both sides of the state line — downtown and the Crossroads, the Northland and the Missouri suburbs, Overland Park, Leawood, Lenexa and Olathe in Johnson County: daylight response, occupancy shedding, scheduling by building mode, tenant zoning and BACnet/IP integration with the building system. A lighting control system can only do what the drivers in your ceiling will let it do, so every retrofit starts with a survey of what is actually up there, because that is what sets the scope. What a buyer can verify before signing: the Lutron Certified Dealer credential in Lutron’s own directory, a written sequence of operations your engineer and code official can read, a fixture-by-fixture dimming test before design, and a five-year workmanship warranty on our labor. Phone: (913) 804-7575 or office@integrateit.tech.

Below: why the fixture survey comes before the platform, how the wireless-or-wired decision really gets made, what the energy code forces and what it does not, why daylight harvesting pays differently in a Kansas City December than in June, what an older downtown building changes, and why commissioning has to happen twice.

The survey comes before the platform

Most disappointing commercial lighting-control projects were sold on a platform and specified from a floor plan. The trouble is that a control system does not dim light; it tells a driver to dim, and the driver decides what happens next. Buildings that have been relamped and remodeled over the years — which is most of them — end up with three or four generations of fixture in one ceiling: some with a proper low-voltage dimming input, some switching-only, and some with inexpensive drivers that nominally dim but flicker in the bottom of the range, drop out entirely, or refuse to come back on cleanly.

So we survey. We identify every fixture type on the floor, pull a sample of each, and bench-test how it behaves at the low end before a single control device is specified. That survey produces three lists: fixtures that dim properly and can carry the full sequence, fixtures that can be scheduled and shed but not dimmed, and fixtures that should be re-driven or replaced because no control layer will make them behave. The third list is the uncomfortable conversation, and it is much better had before the bid than after the ceiling is full of new hardware and one zone strobes.

Wireless or wired is a pathway decision

Lutron Vive is the wireless commercial platform: controls, sensors and keypads communicate over a radio link, so the retrofit does not need new control conduit. That is decisive in an occupied tenant space, in a building with a poured-concrete deck and no accessible ceiling, and anywhere the work has to happen over a weekend without shutting a floor down. Lutron Athena is the larger platform, wired or wireless, and it is where we go on ground-up construction and on buildings that want deep zoning, tenant submetering and a full integration with the building system.

The honest trade-offs run both ways. Wireless removes the wire but adds battery-powered sensors with a replacement cycle somebody has to own, and its mesh behaves according to what your building is made of — a steel-racked warehouse or a concrete-and-block core needs more repeaters than a floor plan suggests, and we would rather walk the space with a radio survey than find that out at commissioning. Wired costs more at install and asks for pathway, and pays it back in determinism: it does what it did yesterday, forever.

What the code makes you do, and what it does not

Commercial energy codes across the metro push the same three things: lights shed or shut off when a space is unoccupied, daylit zones respond to the daylight they receive, and control is zoned rather than building-wide. Both Lutron commercial platforms meet those requirements, and we hand your engineer and your code official a written sequence of operations that matches what the system actually does, rather than a manufacturer brochure.

What the code does not do is make the building pleasant. A minimum-compliance system snaps lights off on people in a conference room who sat still too long, drops a corridor to darkness at the exact moment somebody walks into it, and leaves a lobby that reads as a warehouse at four in the afternoon. The value above the minimum is all tuning: holdover times set to how the space is genuinely used, fades instead of hard switching, an occupancy mode for cleaning crews that is not the same as the mode for a working Tuesday, and scene presets on conference and huddle keypads that tie to AV state — presentation, video call, whiteboard, lights up — through Crestron or the room controller. That is the part staff notice, and it is the part that stops people from taping over a sensor.

Daylight in a Kansas City December

Daylight harvesting is usually the largest single win on a retrofit, and it only exists where there is daylight. Perimeter offices, storefront retail on a glass frontage and atriums earn it. Interior open plan, back of house and corridors earn nothing from it and everything from occupancy shedding and scheduling instead. Being honest about which zones are which is the difference between a modeled saving and a disappointed owner.

Kansas City then adds a seasonal shape that a national spec sheet does not carry. The useful daylight window here collapses in December compared with June, and a run of flat overcast winter weeks contributes far less at the sensor than a clear day implies. Two consequences for the design. First, schedules run on sunrise and sunset rather than on clock times, so the building tracks the season instead of drifting out of step with it twice a year. Second, the daylight sensors are set with real winter behavior in mind rather than tuned on the bright October afternoon we happened to commission on, which is why we come back — described below.

Older downtown stock, newer Johnson County build

The metro gives this trade two very different buildings. In the older commercial stock downtown and in the surrounding business districts, the deck is often exposed concrete or timber, the ceiling is not a place you can hide anything, the electrical was extended in several eras, and circuits do not follow the room boundaries anyone uses today. There, wireless control that can be zoned in software rather than rewired is frequently the only sane answer, and the survey work is heaviest — we trace circuits rather than trusting a panel schedule that was accurate two remodels ago.

New construction in Overland Park, Lenexa and the rest of Johnson County is the easier and cheaper case. The control pathway is in the drawings, the fixture package is one generation, the zoning is drawn before the walls exist, and the whole system is coordinated with the electrical contractor on paper. Same argument as our new-construction low-voltage work: a decision made on a drawing costs a fraction of the same decision made on a ladder.

Commissioning happens at noon and after dark

A lighting system is not commissioned when it powers up. Occupancy sensors have to be walked — actually walked, at the pace and along the paths people use, in every zone — to catch the ones that miss someone sitting still at a desk and the ones that trigger from a corridor through a doorway. Daylight sensors have to be set against real daylight, which means being in the building in the middle of a bright day and again after dark, so the zone does not overshoot at noon or hunt at dusk.

You get the sequences of operation in writing, the zone map, the schedule, and admin credentials issued in the building’s name rather than ours. Where the system exposes energy data per zone, we set up the reporting so it is usable for tenant submetering rather than a feature nobody logs in to see. Every install carries a five-year workmanship warranty, the equipment carries its manufacturer warranty, and you have our support for as long as you own the system. Send a fixture schedule to office@integrateit.tech, or plan a site walk and we will start with the ceiling.

Common questions

Who programs commercial lighting control for a business build-out in Kansas City, Missouri?

IntegrateIT programs commercial lighting control for business build-outs in Kansas City, Missouri and in Overland Park, Kansas — the whole metro on both sides of the state line, from an office in Overland Park, KS. Lutron Certified Dealer, Control4 Platinum Dealer with a Control4 Certified Showroom, Crestron Elite Partner, CEDIA member and HTA Certified, BBB-accredited, founded in 2021 by Daniel and Moran Alon. We design, install, program and commission Lutron Vive and Athena. On commercial retrofits we start with a survey of what is actually in the ceiling — fixture types, drivers and dimming method — because that, not the platform, decides what the project looks like, and older downtown and Crossroads buildings with a concrete deck change the answer again. Daniel walks every project. Phone (913) 804-7575 or office@integrateit.tech for commercial RFPs.

Who programs commercial lighting control for a business build-out in Overland Park, Kansas?

IntegrateIT. Our office is at 15108 Glenwood Ave in Overland Park, Kansas, so Johnson County build-outs — Overland Park, Leawood, Lenexa and Olathe — are the short drive, and Kansas City, Missouri is the same crew on the same day. Lutron Certified Dealer, Control4 Platinum Dealer with a Control4 Certified Showroom, Crestron Elite Partner, CEDIA member, HTA Certified, BBB-accredited. Johnson County build-outs are usually new or substantially rebuilt, which is the case where Lutron Athena is worth specifying and where control conduit can still be run; a finished tenant space with an inaccessible ceiling is where Vive earns its place. We coordinate the sequences of operation with your engineer and code official, and commission twice — once at substantial completion and again once the space is occupied. Phone (913) 804-7575 or office@integrateit.tech.

How much does commercial lighting control cost in Kansas City?

It depends on square footage and fixture count, whether the retrofit can go wireless or has to be wired, how many of the existing drivers can be controlled as they are, and how deeply the system ties into the building. We publish no ranges, because the fixture survey moves the number more than the platform does. Send the fixture schedule and a floor plan and we return a fixed written bid covering hardware, installation, programming, commissioning and the sensor calibration walk. Call (913) 804-7575. For the residential side of lighting control, the cost guide at /cost/lutron-homeworks-kansas-city/ shows how zone count drives a number.

Lutron Vive or Lutron Athena — which one is right for our building?

The pathway usually decides it. Vive is wireless: the controls talk over a radio link, so a retrofit does not need new control conduit, which is what makes it the right answer in a finished tenant space or an older building with a concrete deck and no accessible ceiling. Athena is the larger commercial platform, wired or wireless, and it is what we specify on ground-up construction and on buildings big enough to want deep scheduling, granular zoning and full building-system integration. The honest trade-off is service life and service model: wireless removes the wire but adds battery-powered sensors with a replacement cycle and a mesh whose behavior depends on what your building is made of. In a poured-concrete or steel-racked space, wireless needs more repeaters than a brochure floor plan suggests.

Will control work with the LED fixtures we already have?

Sometimes, and this is the question to answer before anything else. A control system can only dim a fixture the way its driver allows. Fixtures with a standard low-voltage dimming input are straightforward. Fixtures with drivers that are switching-only can be scheduled and shed but not dimmed. And there is a large middle category — inexpensive LED fixtures with drivers that nominally dim but flicker, drop out or refuse to restrike at the bottom of the range. We survey a sample of each fixture type and test it before we design, because the alternative is a commissioned system that misbehaves in one zone and undermines confidence in all of it. Occasionally the honest recommendation is to replace drivers or fixtures in one area rather than buy control that cannot reach them.

How much will daylight harvesting actually save us?

Meaningfully in daylit space and nothing at all elsewhere, so the number depends on your building rather than on an industry average we could quote. Perimeter offices, storefront retail and atriums are where it pays; interior zones, back of house and windowless corridors save nothing from daylight and everything from occupancy shedding and scheduling instead. Kansas City adds a real seasonal wrinkle: the useful daylight window in December is much shorter than in June, and a run of overcast winter weeks contributes far less than a spec sheet implies. Rather than publish a percentage, we model your building from its own fixture schedule and hours of use and show the arithmetic alongside the bid.

Can lighting control talk to our building management system?

Yes. Lutron commercial systems expose lighting as BACnet/IP objects — zones, scenes, occupancy state and measured light levels — so your building system can read lighting status and drive occupancy modes without either side needing custom code. We coordinate directly with whoever maintains your BMS, agree the object list in advance, and test each point with them present rather than handing over a list and hoping. Where the building also has conference-room AV, we tie lighting scenes to room state so a presentation scene is one press rather than two systems disagreeing.

Does this meet energy code, and is code compliance the whole point?

Compliance is the floor. Commercial energy codes across the metro drive the same core requirements: lighting in most spaces has to shut off or shed when unoccupied, daylit zones have to respond to available daylight, and control has to be zoned rather than building-wide. Both Lutron commercial platforms are built to satisfy those requirements, and we document the sequences of operation so your code official and your engineer can read what the system actually does. But a building that only chases compliance ends up with lights snapping off on people. The work worth paying for is the tuning above the minimum: holdover times that match how a space is really used, gradual fades instead of hard switching, and scenes that make a lobby or a conference room look intentional at every hour.

Most projects combine two or three of these. Worth a read.

Further reading

Where to go next if this article gave you the framework but you want the brand- or install-specific depth.

Start with a conversation.

Send the plans, the RFP, or a photo of the room. We return a fixed bid, not a range.

Also serving across the metro

We install in every wealthy neighborhood between Loch Lloyd and the Plaza — and every estate from Mission Hills to Lake Quivira. Pick your neighborhood for the locality page.

Written by Daniel Alon, founder of IntegrateIT LLC, with twenty years in IT and AV integration — Control4 Platinum Dealer, Crestron Elite Partner, Lutron Certified Dealer, CEDIA member, HTA Certified. Overland Park, KS.

IntegrateIT

Premium home automation.

  • Kansas City metro
  • Kansas and Missouri
  • South Florida

Visit our Design Center

15108 Glenwood Ave
Overland Park, KS 66223

Follow us on social media

Member & sponsor ofDesignKC MagazineHBA KCPWBASIDNKBA

Built so you forget it's built.

powered by

IntegrateIT

Kansas City·South Florida